Little Crum Creek BMP Sites - Preliminary Recommendations
Municipality: Springfield Township
- Site:
Springfield Square
Map of Location in Watershed
(click to view - site outlined in red)
Aerial Image of Site
(click to view - site outlined in red)
Coordinates -
Latitude: 39d_54m_48.53s NORTH,
Longitude: 75d_20m_3.14s WEST
Elevation: 200 ft
Hydrologic Zone: headwaters
Riparian? : yes
- BMP: Green Roof
Infiltration? : no
Contributing Area: 2.4 (acre)
Benefits:
- Volume Reduction
- Energy Savings
- Heat Island Reduction
- Flood Frequency Reduction
-
Location: Cresson Lane, Springfield
-
Location: Georgetown Road, Ridley Twp
Comment: Green roof is ideally suited for large flat roofs.
- BMP: Bioretention
Infiltration? : yes
Contributing Area: 14.7 (acre)
Benefits:
- Volume Reduction
- Groundwater Recharge
- Pollutant Washoff Reduction
- Flood Frequency Reduction
-
Location: Cresson Lane, Springfield
-
Location: Georgetown Road, Ridley Twp
Comment:
Parking lot well suited for bioretention islands with infiltration since located in headwaters. Recent (July,
2009) addition to lower
parking lot covers old stormwater detention basin visible in the image. Detention basin was replaced by concrete
retention box under
parking lot extension adds capacity to hold 1 foot of depth encouraging infiltration of a portion of the water
quality volume.
- Site: Farmhouse Circle / PECO Training Facility
Map of Location in Watershed
(click to view - site outlined in red)
Aerial Image of Site
(click to view - site outlined in red)
Coordinates -
Latitude: 39d_54m_7.31s NORTH,
Longitude: 75d_20m_9.03s WEST
Elevation: 112 ft
Hydrologic Zone: headwaters
Riparian? : yes
- BMP: Constructed Wetland
Infiltration? : yes
Contributing Area: 52 (acre)
Benefits:
- Volume Reduction
- Groundwater Recharge
- Enhanced Evapotranspiration
- Pollutant Washoff Reduction
- Flood Frequency Reduction
-
Location: Georgetown Road, Ridley Twp
- Aesthetics Enhance Property Value
Comment:
Convert dry detention basin at Farmhouse Circle into small constructed wetland with infiltration and evapotranspiration
and
install constructed wetland on PECO training facility at southwest corner of property.
- Site: Low Intensity Residential Neighborhoods
Map of Location in Watershed
(click to view - site outlined in red)
Aerial Image of Site
(click to view - site outlined in red)
Coordinates -
Latitude: 39d_54m NORTH,
Longitude: 75d_19m WEST
Elevation: 140 ft
Hydrologic Zone: headwaters and lowlands
Riparian? : partially
- BMP: Disconnect Downspouts from Storm Sewer
Infiltration? : yes
Contributing Area: 142 (Acres)
Benefits:
- Runoff Volume Reduction
- Water Quality
- Pollutant Washoff Reduction
- Enhanced Evapotranspiration
Comment:
Develop a program in the Township to encourage and subsidize private residential land owners to install rain barrels
and
rain gardens and to connect roof gutters and other drains to them while disconnecting them from the storm sewer
system.